Your search results for "New 500-420 Exam Experience 🧎 Test 500-420 Free 🚋 Reliable 500-420 Dumps 🌗 Enter ➤ www.pdfvce.com ⮘ and search for [ 500-420 ] to download for free 🎷500-420 Standard Answers"

191 - 200 of 221

Managing human factors in Hong Kong through a risk-based approach

vancouver

A paper which describes how a risk-based model to tackle human factor issues has been adopted for the railways in Hong Kong. With this model appropriate safeguards and inspection plans are implemented to reduce the risk arising from human factors. The second part of the paper seeks to shed light on potential human issues in railway development, drawing on lessons learned from five railway accidents which occurred between 2010 and 2012.

Year of Publications: 2013

Document: View

Changing National Rail Safety Planning in Korea

johannesburg

A paper which describes details of new safety measures being implemented on Korean railways. The safety measures were being introduced as a result of train accidents due to human factors.

Year of Publications: 2015

Document: View

The Technology of People

johannesburg

A paper describing how Transnet Freight Rail introduced new locomotives and new technologies. Operational readiness included interventions for employees involved in all aspects of introducing new assets. The human-machine interface is significant and has to be carefull manged. The paper shows that if properly planned and managed, legacy and modern systems can coexist.

Year of Publications: 2015

Document: View

Predictive Risk-based strategies to manage safety

johannesburg

A paper which describes the differences between conformance and performance based risk strategies and discusses the advantages and disadvantages of each. The paper concludes that conformance to standards and regulations are rquired to maintain the current safety status and that the idea that risk-based regulation should replace compliance-based regulation is incorrect.

Year of Publications: 2015

Document: View

Managing the safety performance of rail system stakeholders

johannesburg

A paper which explains the assessment and performance matrix developed by the French National Safety Authority to make best use of data collected across all activities to assess the maturity level of stakeholder SMS.

Year of Publications: 2015

Document: View